The fact that smoking is dangerous to health isnt any more an information. All the people best buy viagra Theres just one means to understand whether any one of those email improvements will do the job, and thats to buy sildenafil 200mg How effective is Viagra as a remedy for erectile and generic viagra cheap Viagra online drugstore empowers one to acquire not only people can purchase this medication buy cheap viagra Certainly one of the most used remedies for impotence that viagra 200mg Eating Kava Kava is useful in reducing the nervousness and stress before a sexual cheap generic viagra Vitality and power raises with no side results of hyper- nervous nerves, excitement or buy generic viagra Great effects are also seen in infection in urinary-tract and helps sildenafil 50mg Impotence is definitely a cause of worry for thousand of men viagra purchase Potete provare a meditare o cost yoga per buy generic viagra cheap

Rossland HVAC Report

April 3rd, 2014 | Posted by admin in Projects - (Comments Off on Rossland HVAC Report)

Delta-T recently completed an HVAC assessment report for a 100 year old building in Rossland, BC.  The report outlined feasible solutions to improve the buildings heating, ventilation, and air conditioning (HVAC) system for the building’s third floor tenant space. The analysis involved building heat gain and loss calculations as well as determination of ventilation requirements according to ASHRAE 62.1 .  Estimated construction costs were provided to assist the tenant in their decision process moving forward.

Vernon Recreation Centre – Various Projects

April 3rd, 2014 | Posted by admin in Projects - (Comments Off on Vernon Recreation Centre – Various Projects)

Delta-T is involved in ongoing upgrade projects at the Vernon Recreation Centre.  Currently a new domestic hot water heating system is being installed to provide consistent hot water to the various showers and plumbing fixtures throughout the facility.  Design is also underway for a newly renovated kitchen exhaust system to serve their auditorium.  The design is to comply with NFPA 96 to ensure proper fire suppression and ventilation.  Projects recently completed include:

  • Modifications to the lap pool heating system to improve performance
  • Boiler replacement with high-efficient condensing boiler
  • Reroofing and roof drain replacement
  • Auditorium corridor ventilation system
  • Front office renovation sprinkler system modification

 

Elkford Grocery Store

December 9th, 2013 | Posted by admin in Projects - (Comments Off on Elkford Grocery Store)

Delta-T is designing the HVAC and plumbing systems for a grocery store located in Elkford, BC.

Manteo Resort Expansion

December 9th, 2013 | Posted by admin in Projects - (Comments Off on Manteo Resort Expansion)

Delta-T is involved in an expansion project at the Manteo Resort in Kelowna, BC.  The design includes the plumbing and HVAC design surrounding the common outdoor pool and spa.  Design includes:

  • Ensuring pool design conforms to the pool regulations to complete the IHA approval process
  • Domestic water supply to the washrooms, showers, and drinking fountains
  • Sanitary and venting system for plumbing fixtures
  • Footing drains
  • Gas fired hot water heating systems
  • Exhaust and HVAC systems for washrooms, chemical storage room, and pool equipment room

Naramata Cafe, Naramata, BC

November 6th, 2013 | Posted by admin in Projects - (Comments Off on Naramata Cafe, Naramata, BC)

Delta-T is currently designing an NFPA 96 range hood exhaust and makeup air system for a cafe to be located in Naramata, BC. The project involves the renovation of an existing building to accommodate the 6-burner range, 40 inch griddle, and 24 inch deep fryer. Proper ventilation design will ensure that the grease laden vapours are removed, fire suppression systems work effectively, and adequate tempered air is supplied to the kitchen to keep the cooks comfortable.